Archive

Gallery 9

Gallery 9

Description: Ocean transportation and inland freight for a Aluminum die casting plant for the Automotive industry. From Door Hiroshima, Japan to Silao, Guanajuato MX.

Gallery 8

Gallery 8

Description: Ocean transportation and inland freight for a Combined cycle power plant. From Bremerhaven, Germany to Dulces Nombres Nuevo Leon. 4 x 40 Flat Rack containers out of Gauge. 107 tons

Gallery 7

Gallery 7

Description: Inland transportation, storage and rigging services for Wind Turbines and parts. From Altamira Tamps to Llera de Canales installation site.

Gallery 6

Gallery 6

Description: Door – Door logistics of a Butterfly valve and Water turbine for Hydro power. From Door Morelia, Michoacán MX to The Cerro del Águila Hydroelectric Project in Perú. 533 Ton, 465 cbm. Moved in 19 trucks. Shipped by Break

Gallery 5

Gallery 5

Description: Door – Door logistics of a Butterfly valve for Hydro Power. From Door Morelia, Michoacán MX to The Reventazón Hydroelectric Project in Costa Rica. 423 Ton, 233 cbm. Moved in 8 trucks. Shipped by Break Bulk Ocean service to

Gallery 4

Gallery 4

Description: Door – Door logistics of an Overhead cranes system for a new Automotive manufacturing plant. From EXW Terms in Busan, Korea to Pesquería, Nuevo Leon MX. A total of 314 ton, 1250 cbm. Which required 31 trucks to move

Gallery 3

Gallery 3

Description: Ocean and Inland transportation of a RH Vacuum degassing plant from Austria to Monclova, Coah MX. A total of 507 ton which required 38 truck loads of overdimensional and heavy weight loads.

Gallery 2

Gallery 2

Description: Transportation of a Deisobutanizer drum in Coatzacoalcos, VER MX Weight 635,600 Lbs

Gallery 1

Gallery 1

Description: Transportation of an Offshore module in Houston, TX Weight 161,500 lbs